Title and statement of responsibility area
Title proper
plans- Hoist supporting structure- central tower.
General material designation
- Graphic material
Parallel title
Other title information
Title statements of responsibility
Title notes
Level of description
Item
Repository
Reference code
018.323
Edition area
Edition statement
Edition statement of responsibility
Class of material specific details area
Statement of scale (cartographic)
Statement of projection (cartographic)
Statement of coordinates (cartographic)
Statement of scale (architectural)
Issuing jurisdiction and denomination (philatelic)
Dates of creation area
Date(s)
-
1960 (Creation)
Physical description area
Physical description
Measurements: Length 163 cm Width 77 cm
Publisher's series area
Title proper of publisher's series
Parallel titles of publisher's series
Other title information of publisher's series
Statement of responsibility relating to publisher's series
Numbering within publisher's series
Note on publisher's series
Archival description area
Custodial history
Information about the construction of the causeway. Belonged to George Frail , the Chief engineer of the Annapolis river causeway. Died Feb 13, 2015.
Scope and content
Plans for the assembly and details of the center tower of the hpist supporting structure. By Davies ship building LTD. Drawn by J. Courier. Includes revisions, material list, measurements , diagrams, and specifications. Drawing number: 1527-E-27
Notes area
Physical condition
Excellent condition.
Immediate source of acquisition
Received in 2005 from Pam Frail (daughter of George frail.) 68 Kent ave, wolfville ns. B4P 1V1 902-542-5952